Top Mark Convention - 2-Digit Date Code

Contents
Summary | Calendar Year Scheme | Eight-week Scheme | Six-week Scheme | Two-week Scheme | Single-week Scheme

Summary

Symbol Format Description Applicable Packages
&2 XY 2-digit date code
X stands for calendar year
Y stands for workweek
All leadfree (except tiny pkg)
All DPAK (except Discrete)
All MLP (except <3x2mm pkg)
Molded Dip 8 and 10Ld
MSOP, QSOP, SOP, VQSOP
SOIC 8L, 14L, 16L, 20L, 24L
SOIC 8L, 16L
SOT-23 except Discrete
SOT-23 CPG
SOT-223 analog
SPAK
TO Headers
TO Plastic analog
US8
All SSOP, EIAJ
TSSOP 8, 14, 16, 20, 24, 28, 48, 56, 64 L
WLCSP

Table 1: Numeric Calendar Year Coding Scheme

Calendar Year Non-Pb-free Products Pb-free Products
2000 0Y AY
2001 1Y BY
2002 2Y CY
2003 3Y DY
2004 4Y EY
2005 5Y FY
2006 6Y GY
2007 7Y HY
2008 8Y JY
2009 9Y KY
Note: The marking of the calender year will repeat after the cycle of ten (10) years.
Y stands for workweek code.

Table 2: Eight-week binary date code scheme
For Tiny Logic and Analog SC70, SOT-143, SOT-89, SOT-23 (3 and 5 leads)
and MLP (3x2 mm or smaller than 3x2 mm) Packages.   Date Code Type is "S8" for this scheme.

Workweek No. Binary Translation
Workweek 08-15 X1
Workweek 16-23 X2
Workweek 24-31 X3
Workweek 32-39 X4
Workweek 40-47 X5
Workweek 48-51 X6
Workweek 52-07 X7

Table 3: Six-week numeric date code scheme
Date Code Type is "S6" for this scheme.

Workweek No. XY/&2
Workweek 06-11 X1
Workweek 12-17 X2
Workweek 18-23 X3
Workweek 24-29 X4
Workweek 30-35 X5
Workweek 36-41 X6
Workweek 42-47 X7
Workweek 48-51 X8
Workweek 52-05 X9

Table 4: Two-week numeric date code scheme
Date Code Type is "S2" for this scheme.

Work Week No. XY/&2
Workweek 1,2 X0
Workweek 3,4 X1
Workweek 5,6 X2
Workweek 7,8 X3
Workweek 9,10 X4
Workweek 11,12 X5
Workweek 13,14 X6
Workweek 15,16 X7
Workweek 17,18 X8
Workweek 19,20 X9
Workweek 21,22 XA
Workweek 23,24 XC
Workweek 25,26 XD
Workweek 27,28 XE
Workweek 29,30 XF
Workweek 31,32 XH
Workweek 33,34 XK
Workweek 35,36 XL
Workweek 37,38 XN
Workweek 39,40 XP
Workweek 41,42 XR
Workweek 43,44 XS
Workweek 45,46 XT
Workweek 47,48 XU
Workweek 49,50 XX
Workweek 51,52 XY
Workweek 53 XZ

Table 5: Single Week Coding Scheme
Note: SOT-23, SSOT-3, SSOT-6 and SC70-6 Discrete Packages
Date Code Type is "S1" for this scheme.
Workweek # -- Character Single Week Coding Scheme Table' /> </p>
  <p><a href=Back to top

Back to Top Mark Search tool

English Chinese Japanese Korean