Fairchild Semiconductor Optoelectronics Reliability

At Fairchild Semiconductor, product dependability is assured through an active program which includes:

New product qualification
All new products evolve through an orderly design-to-manufacture flow. At each state reliability engineering is present to ensure that the defined reliability requirements are met.

The reliability plan is implemented in the development stage where actual testing begins. Stress tests are performed to show potential problem areas and the reliability of the new product is compared directly with that of a previously qualified product of a similar generic type.

During limited production, where components must meet defined reliability goals, samples from a minimum of three lots are taken for extensive testing. These samples must meet or exceed defined goals in order for the product to be considered qualified and transferred to the reliability monitoring program.

Quality Control
Quality controls is a vital function at Fairchild Semiconductor. To minimize variations in the product and to maintain quality and hence reliability, the following in-process control activities are routinely performed:

• Incoming inspection of all piece parts and raw materials
space
• Die-attach process control gate
space
• Wire-bond control gate
space
• Encapsulation control gate
space
• 100% final testing
space
• Equipment monitors
space
• Final QA gate of all lots
space
• Finished goods stores monitor
space
• Frequent process line audits for conformance to specification
space

Monitor Program
To ensure that qualified products continue to meet reliability targets, a monitor program tests generic device families on a periodic basis and provides information for the reliability test bank.

Reliability monitoring consists of the following tests*:

High Temperature Operating Life
TA = 70°C or higher temperature
Time = 1000 hours minimum
IF = max. rated
space
High Temperature Storage
TA = 150°C (black pkg), 125°C (white pkg)
Time = 1000 hours minimum
space
Low Temperature Storage
TA = -55°C or specified
Time = 1000 hours minimum
space
85/85 No Bias and Bias
TA = 85°C
RH = 85%
space
HTRB
TA = 100°C or specified
Voltage = 80% max. rated
Time = 1000 hours minimum
JEDEC, Method A108A
space
Temperature Cycle per MIL-STD-883E, Method 1010.7
TA = -40°C to +125°C (white pkg), -55°C to +125°C (black pkg)
Number of cycles = 200 (white pkg), 100 (black pkg)


space

 

Solder Heat Tests
JEDEC, Method B106-B
TA = 260°C ± 5°C
Duration = 10 sec.
space
Room Temperature Operating Life (for light emitting diodes only)
TA = 25°C
IF = 60mA or max. rated
Time = 1000 hours
space
High Humidity, High Temperature Reverse Bias
TA = 85°C
Humidity = 85%RH
Time = 1000 hours
JEDEC, Method A101-B
space
High Temperature Forward Bias
TA = 70°C
IF = 20mA
Time = 1000 hours
JEDEC, Method A108-A
space
Autoclave
TA = 121°C
Pressure = 15psi
Humidity = 100%
Time = 96 hours
space
IR Reflow
Peak temperature
space= 225°C JEDEC (J-STD-020)
space= 245°C CECC 00082
Number of cycles = 3
space
Solderability Test
TA = 245°C
Preconditioning: steam aging for 8 hours
Time = 5 seconds
MIL-STD-883E, Method 2003.7
space
Lead Fatigue
Angle = 3°
Weight = 8oz.
Number of cycles = 5
MIL-STD-883E, Method 2004.5
space

Reliability Test Facilities
The Kuala Lumpur (Malaysia) test facility is equipped with:

• Automated testing
space
• Life test equipment-high and low temperature
space
• Temperature/humidity chambers
space
• High temperature ovens
space
• T/C equipment
space

In addition, the failure analysis lab facilities have the following capabilities:

• Electrical testing and verification
space
• Pin-to-pin measurements
space
• Package dissection and cross-sectioning
space
• Optical photomicroscopy
space
• Micromanipulators
space
• Real-time X-ray chamber
space
• Scanning electron microscope
space
• Access to external labs
space

Failure Analysis and Qualitative Reliability
When a reliability failure does occur, a detailed analysis is performed to provide data for corrective action, as well as guidelines for the design of future new products.

This on-going activity and the resulting feedback and action are illustrated in the accompanying diagram.

*Not all tests apply to all products.

 