Top Mark Convention - 2-Digit Date Code

Contents
Summary | Calendar Year Scheme | Eight-week Scheme | Six-week Scheme | Two-week Scheme | Single-week Scheme

Summary

SymbolFormatDescriptionApplicable Packages
&2XY2-digit date code
X stands for calendar year
Y stands for workweek
All leadfree (except tiny pkg)
All DPAK (except Discrete)
All MLP (except <3x2mm pkg)
Molded Dip 8 and 10Ld
MSOP, QSOP, SOP, VQSOP
SOIC 8L, 14L, 16L, 20L, 24L
SOIC 8L, 16L
SOT-23 except Discrete
SOT-23 CPG
SOT-223 analog
SPAK
TO Headers
TO Plastic analog
US8
All SSOP, EIAJ
TSSOP 8, 14, 16, 20, 24, 28, 48, 56, 64 L
WLCSP

Table 1: Numeric Calendar Year Coding Scheme

Calendar YearNon-Pb-free ProductsPb-free Products
20077YHY
20088YJY
20099YKY
20100YAY
20111YBY
20122YCY
20133YDY
20144YEY
20155YFY
20166YGY
20177YHY
20188YJY
20199YKY
Note: The marking of the calender year will repeat after the cycle of ten (10) years.
Y stands for workweek code.

Table 2: Eight-week binary date code scheme
For Tiny Logic and Analog SC70, SOT-143, SOT-89, SOT-23 (3 and 5 leads)
and MLP (3x2 mm or smaller than 3x2 mm) Packages.   Date Code Type is "S8" for this scheme.

Workweek No.Binary Translation
Workweek 08-15X1
Workweek 16-23X2
Workweek 24-31X3
Workweek 32-39X4
Workweek 40-47X5
Workweek 48-51X6
Workweek 52-07X7

Table 3: Six-week numeric date code scheme
Date Code Type is "S6" for this scheme.

Workweek No.XY/&2
Workweek 06-11X1
Workweek 12-17X2
Workweek 18-23X3
Workweek 24-29X4
Workweek 30-35X5
Workweek 36-41X6
Workweek 42-47X7
Workweek 48-51X8
Workweek 52-05X9

Table 4: Two-week numeric date code scheme
Date Code Type is "S2" for this scheme.

Work Week No.XY/&2
Workweek 1,2X0
Workweek 3,4X1
Workweek 5,6X2
Workweek 7,8X3
Workweek 9,10X4
Workweek 11,12X5
Workweek 13,14X6
Workweek 15,16X7
Workweek 17,18X8
Workweek 19,20X9
Workweek 21,22XA
Workweek 23,24XC
Workweek 25,26XD
Workweek 27,28XE
Workweek 29,30XF
Workweek 31,32XH
Workweek 33,34XK
Workweek 35,36XL
Workweek 37,38XN
Workweek 39,40XP
Workweek 41,42XR
Workweek 43,44XS
Workweek 45,46XT
Workweek 47,48XU
Workweek 49,50XX
Workweek 51,52XY
Workweek 53XZ

Table 5: Single Week Coding Scheme
Note: SOT-23, SSOT-3, SSOT-6 and SC70-6 Discrete Packages
Date Code Type is "S1" for this scheme.
Workweek # -- Character single_wk_table

Back to top

Back to Top Mark Search tool

Fairchild Semiconductor. All rights reserved. Privacy Policy | Terms of Use | Terms of Sale | Trademarks | Site Map | 苏ICP备11059640号 Saving Our World 1mW at a Time
  Knowledge Base Support Request Form.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
         
       
 
 
 
 
 
 
 
 
 
 
 
  Slide to enable Submit button:
 
 
Locked Unlocked